Washdown hose uses an EPDM tube and cover with two synthetic-yarn reinforcement layers for compatible hot-water cleaning duties. The source describes general washdown around dairy, beverage and food-processing facilities. Confirm the actual water temperature, cleaning agents and assembled-hose requirements.
Washdown hose uses an EPDM tube and cover with two synthetic-yarn reinforcement layers for compatible hot-water cleaning duties. The source describes general washdown around dairy, beverage and food-processing facilities. Confirm the actual water temperature, cleaning agents and assembled-hose requirements.
This is a hot-water washdown reference, not a steam hose. Use around a food-processing facility does not by itself establish direct food-contact approval, potable-water compliance or resistance to every cleaning chemical.
| ID (inch) | ID (mm) | OD (mm) | WP (bar) | WP (psi) | BP (bar) | BP (psi) | Length (m) | Length (ft) |
| 1/2 | 13 | 22 | 20 | 300 | 60 | 900 | 100 | 330 |
| 3/4 | 19 | 29 | 20 | 300 | 60 | 900 | 100 | 330 |
| 1 | 25 | 36 | 20 | 300 | 60 | 900 | 100 | 330 |
Pressure and length pairs are source references rather than exact conversions. Confirm the governing units, operating pressure at the actual water temperature, supplied length and complete assembly rating. The source Fahrenheit lower limit conflicts with its Celsius value; the Celsius range is retained here. No steam-service rating is inferred.
Provide the normal and maximum water temperature, pressure, cleaning agents, hose route and frequency of use. Confirm material compatibility and the required end fittings or nozzle connection. A hot-water rating does not establish suitability for steam cleaning.
The source describes washdown in dairy, brewery, cannery and bottling environments. Specify any food-contact, potable-water or cleaning-chemical requirements separately and ask for the applicable documents. No fungus-proof, mould-proof or unrestricted hygienic approval is asserted by this listing.
Choose the required bore from the three listed sizes and state the cut length, coupling type and quantity. Confirm pressure-temperature limits for all assembly components. Account for hose handling, supports and storage so that the fittings do not carry excessive side loads.
Specify material, ID and OD, working pressure, temperature, length, connections and quantity.



Send the conveyed material, pressure, temperature, required bore, installed length and fitting specification. Compare each related construction using its own dimensional and pressure schedule.